Thursday, June 18, 2009

Crazy Spandex Running

Current status of the new pool

When its time for an update :-)

The new pool, I could pick up last Friday.
The first impression was very positive. The basin is meticulously crafted, all holes are available as needed and close it too :-)

am currently am busy all build. The pool is on the frame and is already filled halfway with water osmosis. The technique is
pool, the skimmer is installed.

Only the piping, I have to get ready. Since I had to order another PVC parts and Tangit.
The material I was able to pick up last night. Thus, on occasion I still make the piping fit and finish.

missing then only the overhangs and the pool is slowly but surely go into operation.

0 comments:

Post a Comment